Term contract
New Engineering Contract (NEC) Option G: Term Contract, is a contract for the appointment of consultants.
It provides for the appointment of a consultant for an agreed period of time based on a priced task schedule and staff rates for different grades of staff. Prices on the task schedule are either a lump sum for that item, or may be carried out on a time basis. The consultant bears the risk of being able to perform the tasks at the agreed prices.
When the client wants the services to be carried out they are simply selected from the task schedule and the consultant is instructed.
If the client wants the consultant to carry out services that are not on the task schedule, they are notified as compensation events (similar to relevant events on other forms of contract). This will result additional payment being made, priced using the compensation event assessment procedure.
NB The Chartered Institute of Procurement & Supply (CIPS) Glossary of procurement terms, defines term contracts as: ‘Contracts written to last a period of time and include agreed terms.’
[edit] Related articles on Designing Buildings Wiki
- Appointments.
- Compensation event.
- Contract.
- NEC Option A: Priced contract with activity schedule.
- NEC Option B: Priced contract with bill of quantities.
- NEC Option C: Target contract with activity schedule.
- NEC Option D: Target contract with bill of quantities.
- NEC Option E: Cost reimbursable contract.
- NEC3.
- Procurement route.
- Relevant event.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.